Bellevue Chef Kitchen Transformation

Bellevue Chef Kitchen Transformation

West Bellevue, WA
residential
Service General Construction
Duration 8 weeks
Budget $120K – $150K
Completed 2026

About This Project

A complete demolition and rebuild of a 1990s galley kitchen into an open-concept chef's kitchen spanning 480 sq ft. The layout was restructured to integrate a 10-foot Calacatta marble island, butler's pantry, and integrated Sub-Zero refrigeration.

Project Scope

  • Full demolition
  • structural wall removal
  • custom cabinetry
  • marble countertops
  • appliance installation
  • tile backsplash
  • plumbing & electrical

Transformation

Before
Before
After
After

Project Overview

  • Client Private Client
  • Type residential
  • Location West Bellevue, WA
  • Completed

Interested in a Similar Project?

Our team is ready to bring your vision to life with the same level of craftsmanship.

Request an Estimate

Or call us at +1 (206) 880-8334

Project Gallery

Project Image 1
Project Image 2
Project Image 3